Baton Rouge Centroplex (now the River Center)
Construction began April 1975 and was finished in Sept. 1977.
Cost: $17,802,434.00
Designed by Desmond-Miremont-Burks, a Baton Rouge architectural firm.
Original ground-breaking ceremonies for the Centroplex were planned for 1 April 1973 before delays occurred.
Source: VF-BR-Centroplex
source: S.T. 6 July 1974